The Project:
Working alongside a Grimsby-based plumber the old boiler and control panel were condemned. I spent time with both the customer and the plumber to find out exactly what they wanted and designed a control panel to suit their needs.
The panel was built off site, allowing for the other trades to carry on, and when the green light was given we then went to strip out the old wiring and panel and got the new panel mounted. Along with the panel we wired in all the new pumps, each with their own individual and local isolator, the boiler cascade system and introduced a safety side which was previously non existent.
This included an emergency stop button to isolate the main gas valve when operated as well as carbon monoxide alarms that also isolates the gas.
Scope Covered
- Removal of old systems
- Control Panel Design & Build
- Control Panel Installation
- Tray Work
- Cable Runs
- Clipping
- Connection to Valves, Motors Etc.
- Commissioning